Dhirendra Kumar
Engineer Project GSM (MTNL), ITI Limited (Govt. of India U/T)
Leading a team of vendors to install the GSM BTS (Alcate lucent BTS 900,1800 & TWIN TRE) and Microwave SAF, Ceragoan & NEC.
sites.
Check installation, Rack configuration, Startup BTS NEW.
Check status of BTS of Modules and SBLs.
Check the Antenna Mapping in RI.
Return Loss Measurements using VSWR Tester or Site Master.
BSC Management – BCCH Recovery Test.
BSC Management – BTS Recovery after PCM Link failure & restoring.
BSC Management – BTS Initialization after power outage.
Check the external alarm.
BSC Management – TRE Power check.
Check transmission parameter.
Sample call and Handover test on Engineering handset.
